Case study overview

  • SDM ECO at tailings thickener in Mexico

    Challenge to regulate the slurry density in the underflow of a tailings thickener.

    Read more >

  • SDM at Muja Power Station

    Replacing radioactive density meters to manage the concentration of fly ash.

    Read more >

  • Gold extraction mining plant

    Measurements are reliable, stable and environmentally friendly.

    Read more >

  • Case study Copper foil

    Monitor the Cu++ and H2SO4 concentrations in real-time

    Read more >

  • SDM in Tunneling Industry

    The customer had to drill a new 200-meter sewer for their project.

    Read more >

  • SDM at Vinacomin Cua Ong Site

    SDM 30-day trial with two different sampling methods in Vietnam.

    Read more >

  • Cannington Paste Plant

    South32 needs to control the density of the slurry going to the storage tank.

    Read more >

  • Ferrochrome Smelter

    Challenge to remove manual sampling from the thickener underflow.

    Read more >

  • SDMs at Agnico Eagle

    SDMs for control purposes in the grinding and separation processes.

    Read more >

  • SDM at Beni Amir Washing Plant

    SDM for monitoring the output of two thickeners and efficiency improvement.

    Read more >